CR, FPA, A-1b(03)T and every other code on your electricity bill, explained

A plain-words dictionary for the abbreviations on a Pakistani electricity bill, from CR and FPA to the codes inside the net-metering QR.

Updated · 3 min read

Short answer

CR means credit. An amount followed by CR is money in your favour: you have paid, or exported, more than you owe, and the credit is carried to your next bill. A CR bill has nothing to pay. The other common codes: FPA is the fuel price adjustment, QTA the quarterly tariff adjustment, MDI the highest load you drew in the month, MF the meter’s multiplying factor, and A-1b(03)T a three-phase domestic connection billed by time of use.

Pakistani electricity bills are dense with abbreviations, and net-metering bills add a second layer of codes inside the QR. Here is every one you are likely to meet on a LESCO, IESCO, FESCO, GEPCO, MEPCO, PESCO or HESCO bill, grouped by where it appears.

Money and balances

CodeMeansWhat to know
CRCreditMoney in your favour, carried to the next bill. A payable amount ending in CR means nothing to pay.
ArrearsUnpaid amount from earlier billsAdded to this month’s total. On a solar bill a negative arrears figure is carried credit.
Payable within due dateAmount due by the due datePay this to avoid a surcharge.
LP surchargeLate payment surchargeAdded if you pay after the due date; the “payable after due date” figure already includes it.
Current billThis month’s charges onlyBefore arrears or credit are added.

Charges and taxes

Full rates and how each one is worked out are in our guide to fixed charges, FPA and taxes.

CodeMeansWhat to know
FPA / FCAFuel price (or fuel cost) adjustmentA per-unit charge or refund for the gap between actual and reference fuel costs, billed about two months later.
QTA / QTR ADJQuarterly tariff adjustmentSet by NEPRA each quarter for capacity payments and other fixed costs; can be negative.
FC / FIX-CHRGFixed chargeA monthly charge per kW of load. Exports can’t reduce it, so it is the floor of every solar bill.
COECost of electricityUnits × rate, before fixed charges and taxes.
GSTGeneral sales tax18% on the energy and fixed charges.
ITIncome tax (section 235)Charged to non-filers on larger bills; joining the Active Taxpayers List removes it.
ED / E-DUTYElectricity dutyA provincial levy, removed for domestic consumers from July 2025; older bills show it.
PTV feeTelevision licence feeRemoved from electricity bills from July 2025.

Connection and tariff codes

CodeMeansWhat to know
A-1aDomestic, ordinary billingMost single-phase homes: units are priced in slabs, the same at every hour.
A-1b(03)TDomestic, three-phase, time of useA = domestic, 1b = three-phase, T = time-of-use billing with separate peak and off-peak rates. Most solar homes are on it.
B / A-2Industrial / commercialDifferent rates and taxes from domestic connections.
S. loadSanctioned load (kW)The load your connection is approved for. The fixed charge is based on it.
Conn. loadConnected loadThe total rating of the appliances declared on the connection.
MDIMaximum demand indicator (kW)The highest load you drew in the month. On time-of-use bills it can raise the fixed charge.
MFMultiplying factorReading difference × MF = units. It is 1 for most homes.
Ref No14-digit reference numberWhat you use to download a duplicate bill or pay online.
Cons ID / CUST-IDConsumer IDA permanent number for the connection. It stays the same if the reference number changes.

Net-metering codes in the QR

Net-metering bills carry a second QR code with the detail behind the energy charge. Scanning it with a phone shows plain text like IMP-OP (KWH): 871. These are the fields, using the codes exactly as printed:

CodeMeans
IMP-OP / IMP-PKUnits imported from the grid, off-peak and peak
EXP-OP / EXP-PKUnits exported to the grid, off-peak and peak
NET-OP / NET-PKImports minus exports in each band. A minus sign means you sent more than you took.
BILLED UNITSThe net units the energy charge is worked out on
MONTH COUNTWhere this bill sits in the settlement cycle, such as 3/3. See quarterly settlement.
REMAINING-PREVIOUS / -PRESENTSurplus units carried forward from earlier months, and left over after this one
DG-CAPACITYYour solar system’s approved size in kW (distributed generation)
COMM-DATEThe date net metering was commissioned on your connection
EXP-MDIThe highest export load in the month (kW)
MCOMeter change order: when the meter was last changed
CONN-DATEWhen the electricity connection was first made
DIV-NAMEThe DISCO division that manages your connection
ED-RATEThe electricity duty rate applied, if any

The lines under BILL CALCULATIONS, such as 46.850 X 326, are rate × units for each band. Multiplying them out and adding them gives the COE. Our step-by-step calculation works through a full bill.

Reading and date fields

  • Prev / Pres reading: the meter reading at the start and end of the billing period. The difference, times MF, is your units.
  • Reading date: when the meter was read. A late reading makes a longer billing period and a bigger bill.
  • Issue date and due date: when the bill was produced and the last day to pay without a surcharge.
  • Bill month: the month the bill is for, usually the month it is issued.
Faster than decoding it by hand: add your web-bill PDF to Solar Bill. It reads both QR codes and every printed figure, and explains each one in plain words.

Questions people ask

What does CR mean in an electricity bill?

Credit. The amount is in your favour and is carried forward to your next bill, so there is nothing to pay. On solar net-metering bills, CR usually comes from exported units.

What is CR in a LESCO bill?

The same as on every PITC bill: credit. If your payable amount ends in CR, LESCO owes you that amount and will set it against future bills.

Should I pay a bill that shows CR?

No. A CR amount is a balance in your favour, not a payment due. Keep the bill for your records; the credit is applied automatically.

What does FPA mean on an electricity bill?

Fuel price adjustment: the difference between the actual fuel cost of generation and NEPRA’s reference cost, charged or refunded per unit about two months later.

What does A-1b(03)T mean?

A is the domestic (residential) category, 1b a three-phase connection, and T time-of-use billing, with separate peak and off-peak rates. Most solar homes are on it.

What is MDI on an electricity bill?

Maximum demand indicator: the highest load, in kW, you drew in the billing month. On time-of-use bills it can raise the fixed charge if it is above half your sanctioned load.

What does MF mean on an electricity bill?

Multiplying factor. Some meters, mainly on larger connections, record a fraction of the real consumption; the reading difference is multiplied by the MF to get your units. For most homes MF is 1.

What does MCO mean in a net-metering bill?

Meter change order: the date your meter was last changed, usually when the green net-metering meter was installed.

Solar Bill is independent and not affiliated with NEPRA, PITC or any DISCO. Rates, taxes and rules change; your DISCO’s bill is the official record. Policy facts above link to their public sources.